Overview & Strategic Context
India's clean energy sector has experienced explosive growth, crossing 168+ GW of cumulative installed solar capacity. However, solar PV panels manufactured with a 20-25 year lifespan—along with transit breakages, early operational failures, and manufacturing cell rejections—are creating an urgent environmental challenge. At our 60-hectare Zero Waste Management Park in Khavda, Kutch, Shree Alliance has engineered India's premier closed-loop Solar PV Recycling facility. Strategically located next to the 30,000 MW Khavda Solar Park, we provide compliant offload and recycling infrastructure directly to developers and EPC contractors across Gujarat and Rajasthan.
Technical Process & Circular Recovery Flow
Mechanized Frame & Junction Box Dismantling
Automated robotic uncoupling of the anodized aluminum frame and junction box with 100% reclaim of copper cabling and prime aluminum alloys.
Non-Thermal Delamination & EVA Separation
State-of-the-art mechanical slicing and gentle chemical-free solvent separation that cleanly detaches the front tempered glass sheet without crushing, retaining low-iron glass value.
Silicon Cell & Contact Recovery
Hydrometallurgical extraction of high-purity metallurgical and electronic-grade silicon wafers from embedded cells.
Precious Metal Leaching & Refining
Advanced hydrometallurgical leaching recovering 99.9% pure silver and copper conductor pastes for return to semiconductor and electrical manufacturing supply chains.
Key Recovered Materials & Commercial Outputs
Statutory Compliance & EPR Framework
Regulatory Standards: Full CPCB Extended Producer Responsibility (EPR) registration, issuance of valid recycling certificates for solar developers, zero toxic water discharge (ZLD), and adherence to MoEFCC e-waste management rules.